One-into-two
Splitting one lot into two. The new lot needs its own sewer and water connections, and a lawful way to get stormwater away, without stuffing up the original house.
Civil | Subdivision packages
When you split a block, the new lot needs sewer, water and stormwater to the authority’s requirements. On a battle-axe, those services usually have to run down the access handle to the rear lot. We put that civil package together.
01 — What’s in the package
This is the in-ground civil work that makes a small subdivision actually serviceable — not the house plumbing, and not the engineering design. We build the connections and the pipework, and we work with your engineer and Urban Utilities or the relevant authority through to testing and sign-off.
Splitting one lot into two. The new lot needs its own sewer and water connections, and a lawful way to get stormwater away, without stuffing up the original house.
A long driveway handle down to a rear lot. Services usually share that narrow access with the driveway — tight work around existing services, often with limited room to swing a machine.
Property connections, inspection openings and any new manholes or short runs needed to pick up the rear or newly created lot.
Property connections, meters and any live work on the existing main, including PE welding where the pipework calls for it.
Pits, pipework and a lawful point of discharge for the new arrangement, so water isn’t just pushed onto the neighbour or the original house.
Connections onto live networks, and working around what’s already in the handle, the verge and the original lot.
02 — How a job runs
Builders and owners often get quoted separately for sewer, water and stormwater, then find the three don’t quite meet in the middle. We price it as one package so the levels, the access and the connections are thought through together.
03 — On site
From a recent one-into-two subdivision.